Project:
Interior Bamboo Tree Installation
Downtown, Vancouver
Holland
Scope Of Work:
A 45' Bamboo tree was purchased
in Florida, transported by climate controlled
van to Vancouver, craned to the second storey
podium of an office tower where it was power
hoisted to the top of the 20 storey roof
and then lowered to its final resting place
in a spiral stair case that started on the
16th floor and reached to the 19th floor.