Special Projects

Project:
Interior Bamboo Tree Installation
Downtown, Vancouver

Holland Scope Of Work:

A 45' Bamboo tree was purchased in Florida, transported by climate controlled van to Vancouver, craned to the second storey podium of an office tower where it was power hoisted to the top of the 20 storey roof and then lowered to its final resting place in a spiral stair case that started on the 16th floor and reached to the 19th floor.

Company Portfolio Employment Contact Home